thermoshield

KingPin Bowling – Townsville Project Summary

Roof Restoration | Rust Conversion | Thermal Insulation 

Project Overview

KingPin Bowling in Townsville was identified as a high-energy consumption site, primarily due to its extensive use of HVAC systems in response to the region’s persistent heat. To address escalating electricity costs, seasonal usage spikes, and HVAC inefficiencies, Thermoshield Australia implemented a dual-solution strategy: 

This initiative aimed to significantly reduce energy consumption, lower operational costs, and extend the lifespan of infrastructure — all while improving occupant comfort and environmental outcomes. 

Key Benefits Delivered

Internal Temperature Reduction

Energy Efficiency & Operational Cost Savings

Environmental Impact

Roof Protection and Longevity

HVAC System Preservation

Why Townsville Was Ideal for Thermoshield

Townsville’s climate — marked by intense, year-round heat and high solar radiation — made it an ideal location for demonstrating the coating’s performance. Unlike ambient temperature alone, solar exposure is the key driver of internal heat load. By reflecting solar energy and preventing heat absorption, Thermoshield directly addressed the root cause of the site’s energy inefficiency. 

Performance Validation

For more information about Thermoshield solutions or to explore a similar energy efficiency upgrade for your site, visit www.thermoshield.com.au. 

After
Before

Contact Us

Thermoshield Australia Pty Ltd
Factory 11, 42 Mills Road, Dandenong, VIC 3175

Email: gavin@thermoshield.com.au
Phone: 0417 563 955

Website: thermoshield.com.au

Edit Template