Rust Conversion | Corrosion Prevention | Asset Protection | Future Proofing
Thermoshield was engaged to restore and protect the boiler house roof of the A&B turbine buildings at Muja Power Station in Collie, WA. The existing roof showed advanced, widespread rust that posed a serious threat of irreparable corrosion and total roof failure.
A full roof replacement was ruled out due to cost, complexity, and safety risks, especially considering the uncertain long-term operation of the power station. Instead, Thermoshield delivered a multi-stage rust conversion and restoration coating system — a highly durable, safe, and cost-effective alternative, backed by a 10-year warranty.
“Thermoshield’s restoration work has safeguarded our turbine boiler house without requiring a costly and dangerous roof replacement. We’ve future-proofed the asset and improved safety for ongoing operations.”
This project demonstrates Thermoshield’s expertise in industrial rust conversion, working at scale in high-risk environments to deliver long-term asset protection with minimum disruption.
Thermoshield Australia Pty Ltd
Factory 11, 42 Mills Road, Dandenong, VIC 3175
Email: gavin@thermoshield.com.au
Phone: 0417 563 955
Website: thermoshield.com.au